Saturday 20th February 2021

Downtime during server migration to a new rack, scheduled 1 month ago

Hi there, Sunday (21.02.2021) early in the morning we will be moving all our servers to a new rack in the datacenter. Since we need to physically transport them from one place to the other, naturally there will be a downtime. Hopefully not too long.

We will begin around 5:00AM (CET) and we think within two hours we should be all done.

Powered by Cachet.